Tuesday, August 6, 2024

More Stuff…

Thursday - Morning coffee with friends at Alaska Coffee Roasters Company. One of the things I miss when gone from Fairbanks. After coffee, I head to storage to pick up the electric chain saw. One of the tools that I want to bring back to the RV. I don’t see a need for it in Alaska and it’s hard to transport on a plane. 

I started stacking things that would be in the Jeep on a shelf in the garage. There isn’t much room in the Jeep but I think the pile of stuff will be modest. I need to start looking for a bicycle rack as I want to bring my old bicycle down to TX. The e-bike is fine but it's not the same.

Friday - It's feeling like Fall is just around the corner. The temperature at 1pm is only 51°F.

Sunday - a not-rainy day for the first time in almost a week. I finished painting the old frame of the front porch. I’m calling it “done”. I also moved the swing back to the rear deck as the eyelets it is currently hanging from were designed for hanging plants not a swing. 

Tuesday - A photographer came by this morning to take pictures of the house for the listing. I left and went to coffee just to avoid hearing something or me saying something about the whole sale process. I'm kind of burned out by all of this. And still sore from mowing the grass and using the string trimmer along the road and driveway. And today, I need to start emptying out the shed. So much junk...

Tuesday, July 30, 2024

Finished the Railing

Monday - The maximum opening allowed on a railing is 4”. There is 59.5” between the posts on the front of the porch. If I assume the balusters are 1.5”, then each gap+baluster is 5.5”. Ten balusters would leave a 4.5” gap at the end. Foiled by ½”! I guess I’ll need 22 balusters for the front railing with 3.58” openings. 

The short end is 63.5” between the posts. Eleven balusters would have 3.91” openings. So I need to find 33 balusters. 

Tuesday - After morning coffee, we picked up the power miter saw from storage and balusters from Home Depot. I was planning to use pressure treated 2x2 but they didn’t have any available. Their app claims that they have 302 in stock. So I ended up using 2x2 cedar for 30% more. But at least this task is done. I need to paint the lower part of the porch as the paint is peeling as well as the three steps. Maybe I’ll pick up some lattice for that lower part. 

The railing really changes the appearance of the front of the house. 

Sunday, July 28, 2024

Getting Things Out of the House

 Friday - After a day to recuperate from the drive, it's back to getting the house ready to sell. I'm to the point of starting to toss things that I would've tried to sell. But we kind of want to be out of here in a month or so. The upstairs is pretty empty but there is still junk in the downstairs bedrooms. I was cleaning out a closet and came across a Lenovo tablet/laptop with Windows 8 on it. I don't remember this laptop at all and don't remember Windows 8 at all. The battery doesn't hold a charge but I think it may be a useful machine as it's pretty will made.

I just finished a test session. As you can see, there isn't much in our living room anymore. The couch was dropped off a few days ago and I think the piano has a new home (hopefully). The floor was just installed while we were gone and it is looking pretty nice. The room really echos.

Saturday - Quite the temperature change especially compared to where I was last week! It has been raining off/on since last night. The fair opened up yesterday afternoon so the rain is right on schedule as it almost always rains during the fair.

I led a test session this morning for the first time is almost a month. I was sure that I was forgetting something but we got through it. The candidate passed easily. I started hauling things from the garage sale “pile” to the transfer station. Things that probably would not sell such a metal filing cabinet. No one is saving paper anymore. It took me quite a while to empty and shred paper from that cabinet. As well as a bunch of paper from my office that were in boxes. 

Sunday - The project of the day was railing for the front porch. One edge is more than 30” above the ground so a railing is required. I picked up some pressure treated posts and several 12’ long 2x4s. They sort of fit in the Prius by going out the front passenger window. Fortunately, it wasn’t raining and it isn’t that long of a drive. 

It took me most of the afternoon but the structural part of the railing is mostly done. I need one 8’ 2x4 and all of the balusters. Lowe’s was sold out of balusters so once I figure out how many I need, I’ll check Home Depot. 


Tuesday, July 23, 2024

Back to Fairbanks

Tuesday - I got an early start this morning as it was cold in the Jeep. Around 48°F without a sleeping bag. The “plan” is to stop at Fast Eddy’s in Tok for their salad bar. But I can’t arrive too early. I stopped in Beaver Creek for coffee and a small breakfast. This sidecar rig was sitting outside. I found the riders and talked to them a bit. 

I stopped at the Tetlin National Wildlife Refuge. They had a pretty good movie and I did remember to stamp my National Park passport book. 

Fast Eddy’s in Tok was the the next stop after filling up. The overall average for this trip has been 28.6mpg. More than satisfactory as was the salad bar at Fast Eddy’s!

But it was a long drive. The is the long, straight road west of Tok.